MAS Consulting is part of the Terranova groupRead the news
MAS Consulting
Arch dam and artificial lake in the mountains

Hydropower plant and reservoir optimiser Every cubic metre of water, at its highest value

IDRO Optimizer is hydropower plant optimisation software: it plans production for entire hydro cascades and calculates, hour by hour, how much to produce, when, and at what price to bid on MGP and MI, respecting the constraints of reservoirs, plants and pipes and keeping spillage to a minimum.

  • Hydropower producers
  • Energy manager
  • Production traders
  • Concession holders

Features

Inside IDRO Optimizer

A reservoir is an energy reserve. Getting the most from hydropower means deciding when to produce to earn the most from every MWh, while respecting levels, flows and concession obligations. IDRO Optimizer, the MAS hydropower plant optimiser, links the physical management of water to market decisions, with optimisation algorithms, including stochastic ones, and machine learning.

Request a demo
01

Long-term planning

  • Optimal use of water resources
  • Price and inflow scenarios
  • Stochastic optimisation under uncertainty
02

Intraday optimisation

  • Hourly production schedule
  • Adjustment to operating and market conditions
  • Fast recalculation when data changes
03

Entry price and bids

  • Entry price calculated hour by hour
  • Quantities and prices to bid on MGP and MI
  • Schedules sent to ERGObid for submission
04

Cascade constraints

  • Reservoirs: levels, minimum environmental flow, filling and drawdown rates
  • Plants: power, start-ups, ramps, flow rates
  • Channels and pipes: maximum and minimum flows
05

Real-time monitoring

  • Reservoir levels and inflows
  • Unavailability and production constraints
  • Prices and market swings
06

What-if and deviations

  • Simulations before deciding
  • Analysis of deviations from the plan
  • Assessments for concession renewals too

How it works, step by step

From water resource to market bid.

01 · Data

Levels, inflows, unavailability, constraints and prices arrive in real time.

02 · Plan

Long-term planning decides how to use the available water.

03 · Optimise

Intraday optimisation calculates the hourly schedule of every plant.

04 · Bid

Entry price, quantities and prices become bids on MGP and MI.

05 · Review

Metering and deviations close the loop and improve the next plan.

Why choose IDRO Optimizer

More revenue per MWhYou produce when energy is worth most, within the constraints.
Constraints always respectedLevels, minimum flows and concession obligations built into the optimisation.
Configurable without developmentThe algorithms adapt to every cascade without custom code.
The heart of IDRO SuiteIt works with MAIA, THESEUS, CAMPO and ERGObid on the same data.

IDRO Optimizer in numbers

A demo of IDRO Optimizer on your case, with data similar to yours. No commitment.

Request a demo
+13%average increase in returns
3.000+ MWof capacity managed
30+cascades modelled

Connected to the rest of the value chain

  • Unavailability that updates the production plan

  • Schedules and bids to MGP, MI and XBID

  • Capacity committed in the Capacity Market

  • Plant data for the producer portal

01What is a hydropower plant optimiser?

It is software that decides how much and when each plant in a hydro cascade should produce to get the most value from the available water, while respecting reservoir levels, minimum flows and concession constraints. IDRO Optimizer is the MAS hydropower plant optimiser: it plans over the long term, recalculates intraday and turns the schedule into bids on MGP and MI.

02How does IDRO optimise a hydro cascade?

It calculates the production of every single plant so as to maximise expected revenue, within all the constraints set on reservoirs, plants, channels and pipes.

03How does it handle spillage?

IDRO aims for the lowest possible spillage: the economic optimisation is penalised by spilled water and by missing the target reservoir levels over the simulation horizon.

04Which constraints can it handle?

On reservoirs: levels, minimum environmental flow, filling and drawdown rates. On plants: available power, daily start-ups, maximum flow, ramps, minimum power or flow and binding schedules. On channels and pipes: maximum diversion flows and minimum flows by period.

05What is the entry price?

It is the minimum price at which it pays to offer a plant's energy on the market: IDRO calculates it hour by hour and uses it to build bids on MGP and MI.

No-commitment demo

See IDRO Optimizer on your data

Leave us your details: we will get back to you to arrange a demo, online or in person, with the people who build the product and with scenarios like yours.

  • More revenue per MWh
  • Constraints always respected
  • Configurable without development

Prefer to write to us? welcome@mas-co.it

Request a demo of IDRO Optimizer

Two minutes. Fields marked * are required.

No commitment. We will get back to you.

6 modules

The products of IDRO Suite

Each module works on its own or with the others and shares the same data. Discover IDRO Suite

Insights on IDRO Optimizer

All articles
How to optimise a hydropower plant: from reservoir to market
Hydroelectric dam seen from above, between reservoir and valley

Guides

How to optimise a hydropower plant: from reservoir to market

Optimising a hydropower plant means deciding when to use the water, not just how much energy to generate. This guide explains the steps: reservoir planning, constraints, entry price and bids, unavailability management and analysis of results.

Read the article
Small hydropower concessions and the Bolkestein Directive: what the EU Court ruling means for renewals and investment
Aerial view of a dam with its hydropower station and water discharging into the river

Energy market

Small hydropower concessions and the Bolkestein Directive: what the EU Court ruling means for renewals and investment

In its judgment of 3 September 2026 the Court of Justice of the European Union made clear that the Bolkestein Directive does not apply to small hydropower concessions. Producers now have room to plan renewals and plant upgrades, but Italian rules on concessions remain in force.

Read the article
How the Italian power market works: MGP, MI, balancing and PCE after TIDE
High-voltage pylon against a sunset sky

Guides

How the Italian power market works: MGP, MI, balancing and PCE after TIDE

The Italian power market is a sequence of markets that hand over to one another: from forward to day-ahead, from intraday to real time. This guide explains who does what, how prices are formed and what has changed with TIDE and the 15-minute market.

Read the article